# Contractor Estimate Template: Free Copy-and-Paste Version

> A free contractor estimate template to copy without signing up, with scope, exclusions, expiry date, deposit terms, change orders and a sign-off explained.

Source: https://clefpro.com/blog/contractor-estimate-template
Published 2026-11-16.
Publisher: Clef Pro (Clef Pro Inc.)

An estimate decides more about a job than the invoice does. It sets the price, and it also sets what's included, how long the price holds, how much you collect up front and what happens when the customer changes their mind halfway through. A lot of end-of-job arguments trace back to something the estimate left out.

This free contractor estimate template covers each of those. Copy it into Word, Google Docs or an email without signing up. Below are a checklist, every field explained with a filled sample for a made-up deck job, a plain-text version to paste, and a change order form to go with it.

**Key takeaways**

- Put an expiry date on every estimate, so an old price can't be accepted after your costs have changed.
- Write what's not included as clearly as what is.
- State the deposit and payment schedule on the estimate, and check your state's limits first.
- Agree in writing how change orders work before the job starts, and get each one signed before you do the extra work.
- If you sell the job at the customer's home, the FTC's Cooling-Off Rule may give them three business days to cancel.

## What goes on a contractor estimate?

A contractor estimate should tell the customer exactly what they're buying, what it will cost, how long the price holds and how they'll pay. That means a clear scope with exclusions, itemized prices, an expiry date, deposit and payment terms, a change order process and a place to sign. Here is the checklist.

- Business name, contact details and license number
- The word "Estimate", an estimate number and the date
- An expiry date, written as "valid until" a calendar date
- Customer name, contact details and the job site
- Scope of work: what you will do, in plain words
- Exclusions: what you won't do
- Line items for labor, materials, permits, disposal and equipment
- Allowances for items the customer hasn't picked yet
- Assumptions the price depends on
- Estimated start date and how long the job will take
- Subtotal, tax and total
- Deposit amount and when it's due
- Payment schedule for the rest
- How change orders work
- Warranty terms
- A cancellation notice, where the law requires one
- Signature and date lines for the customer and for you

## Contractor estimate template: every field, with a sample

The sample column is a made-up deck resurfacing job for a made-up company. The prices are made-up sample numbers to show the layout. Don't read them as a price guide.

| Field | What goes in it | Sample |
|---|---|---|
| Business details | Name, address, phone, email | Sample Contracting Co., 100 Example Ave, Anytown, ST 00000, (555) 010-0100 |
| License number | Your state or local license, if you hold one | License #000000 (sample) |
| Estimate number | Unique, numbered in order | E-1002 |
| Estimate date | The day you send it | November 16, 2026 |
| Valid until | The date the price expires | December 16, 2026 |
| Customer and job site | Name, phone, email, address | Casey Sample, 78 Example Way, Anytown, ST 00000 |
| Scope of work | What you'll do, step by step | Remove deck boards and railing on a 12 × 16 ft deck. Install composite decking and aluminum railing on the existing frame. Haul away debris |
| Not included | What you won't do | Framing repairs, stairs, staining or painting, electrical, landscaping |
| Assumptions | What the price depends on | Price assumes the existing joists are sound. If we find rot, we stop and send a change order before repairing it |
| Allowance | A set amount for items not yet chosen | Composite decking and fasteners, $3,200.00 allowance. Customer picks the color. A pricier line is a change order |
| Demo and disposal | Removal and haul-away | $650.00 |
| Materials | Item and price | Aluminum railing materials, $1,150.00 |
| Labor | Hours times rate, or a fixed price | Install decking and railing, about 32 hrs × $85.00 = $2,720.00 |
| Permit | Estimated, billed at cost | $150.00 (estimated) |
| Subtotal | All line items before tax | $7,870.00 |
| Sales tax | Only what your state requires | 6% on materials (sample rate), $261.00 |
| Total | Subtotal plus tax | $8,131.00 |
| Schedule | Start and length | Start the week of January 11, 2027, about 5 working days, weather permitting |
| Deposit | Amount and when it's due | $800.00 due at signing |
| Payment schedule | Each payment tied to a finished stage | $4,000.00 when decking is installed. $3,331.00 at the final walkthrough |
| Change orders | How changes get approved | Any change to scope, price or schedule is written up, priced and signed by both of us before the work is done |
| Warranty | What's covered and for how long | One year on workmanship. Materials carry the manufacturer's warranty |
| Acceptance | Signatures and dates | Customer and contractor signature and date lines |

## Copy-and-paste contractor estimate template

Copy the block below into Word, Google Docs or an email, replace each bracketed field, and delete any section a small job doesn't need.

```text
ESTIMATE

[Business name]
[Street, city, state, ZIP]
[Phone] | [Email]
License #: [number]

Estimate #: [number]
Date: [date]
Valid until: [date]

CUSTOMER
[Name]
[Phone] | [Email]
Job site: [address]

SCOPE OF WORK
[What you will do, step by step]

NOT INCLUDED
[What you won't do]

ASSUMPTIONS
[What the price depends on]

PRICE
[Item]: [qty] x [price] = [amt]
Labor: [hrs] x [rate] = [amount]
Permit (est., at cost): [amount]
Allowance: [item] [amount]
Subtotal: [amount]
Sales tax ([rate]): [amount]
TOTAL: [amount]

SCHEDULE
Start: [date or week]
Length: [working days]

PAYMENT
Deposit: [amount], due at signing
[Stage]: [amount], due when
  [that work is complete]
Final: [amount], due at
  [completion or walkthrough]
Accepted: [check, transfer, card]
[Late fee, if any]

CHANGE ORDERS
Changes to scope, price or
schedule are written, priced and
signed by both of us before the
work is done.

WARRANTY
[What is covered, how long]

ACCEPTANCE
Customer: ____________ Date: ____
Contractor: __________ Date: ____
```

## How long should an estimate be valid?

Long enough for the customer to talk it over, short enough that your numbers still hold. Material prices move, and a crew you could promise for January may be booked by March. Pick a window you can honor, such as 14 or 30 days, and print the expiry date on the estimate. If the customer comes back after it, re-price before you accept.

Two fields protect the estimate while it's open:

- **Allowances.** When the customer hasn't picked a fixture, tile or decking line yet, price an allowance and say that a pricier choice is a change order.
- **Assumptions.** Say what the price depends on, such as sound framing or no hidden water damage, and what you'll do if it's not true. "We stop and send a change order before we fix it" is better than a surprise on the invoice.

## Deposits and payment schedules: what can you ask for?

Put the deposit and the payment schedule on the estimate, so the customer agrees to them before the work starts. Tie each payment after the deposit to a finished stage the customer can see, such as "decking installed." A finished stage is easier to agree on than a calendar date.

States set their own limits. California is a useful example. Its Contractors State License Board says a home improvement down payment may not exceed $1,000 or 10 percent of the contract price, whichever is less, and that later payments must not exceed the value of the work performed and materials delivered. California contracts also have to carry a "Down Payment" heading and a "Schedule of Progress Payments" heading with set wording in at least 12-point boldface ([CSLB](https://www.cslb.ca.gov/Resources/IndustryBulletins/2022/Industry_Bulletin_Progress_Payment_Restrictions.pdf)). Check your own state's contractor licensing board before you set a deposit.

Payment terms and late fees work the same way. They have to be agreed with the customer before the work, on the estimate or in your written terms, and the rules on deposits, late fees and interest vary by state. Have your standard terms reviewed for the states you work in.

*This is general information, not legal, tax or financial advice.*

## How do change orders work?

A change order is a short written agreement that changes the scope, price or schedule after the estimate is signed. Write the process into the estimate, then use it every time, even for small changes. The customer who asks for "just one more outlet" on Tuesday is the one disputing the total on Friday.

Get the signature before you do the extra work, then bill the change order on its own line of the invoice. A form you can copy:

```text
CHANGE ORDER #[number]
Estimate/contract #: [number]
Date: [date]

Change: [what is added, removed
or different]
Reason: [found rot, customer
request, inspector, other]

Price change: [+ or -] [amount]
New total: [amount]
Schedule change: [days or none]

Customer: ____________ Date: ____
Contractor: __________ Date: ____
```

## What do generic estimate templates miss?

### The three-day cancellation rule for sales at the home

If you sit at the customer's kitchen table and they sign there, federal cancellation rules may apply. The FTC's Cooling-Off Rule gives buyers until midnight of the third business day to cancel many sales of $25 or more made at their home, and the seller has to give them a copy of the contract or receipt explaining the right to cancel and two copies of a cancellation form. It doesn't cover sales made because the customer asked you to come out to repair or maintain their property, or sales needed to meet an emergency, but items sold beyond that request are covered ([FTC](https://consumer.ftc.gov/articles/buyers-remorse-ftcs-cooling-rule-may-help)). Ask your lawyer how it applies to your jobs, and check whether your state adds its own rules.

### Lead-safe work in older homes

If the house was built before 1978 and the job will disturb painted surfaces, the EPA's lead Renovation, Repair and Painting rule may apply. The EPA says firms doing renovation, repair and painting that disturbs lead-based paint in homes and child care facilities built before 1978 must be EPA-certified, and renovators get certified by taking training from an EPA-accredited provider ([EPA](https://www.epa.gov/lead/lead-renovation-repair-and-painting-program-rules)). Ask the year the house was built on every estimate, and price the extra setup and cleanup into the job.

### Options, when the customer is deciding on price

For jobs with real choices, such as repair or replace, or three grades of material, put two or three priced options on one estimate, each with its own scope. The customer picks one and signs next to it. It keeps them comparing your options instead of someone else's.

## How to send an estimate and get it signed

- **Send it the same day as the site visit**, while the customer still remembers the conversation.
- **Make it easy to approve.** A link they can accept from their phone, or a signature line on a PDF, both beat "let me know."
- **Follow up before it expires.** A short note two days after sending and another a few days before the expiry date.
- **Turn it into a job and a work order** once it's signed. Our [work order template](https://clefpro.com/blog/work-order-template) carries the scope and site access to the crew.
- **Invoice the day the work is done**, using the same line items. The [contractor invoice template](https://clefpro.com/blog/contractor-invoice-template) picks up where this one leaves off, and if a payment runs late, our guide on [how to follow up on an overdue invoice](https://clefpro.com/blog/how-to-follow-up-on-an-overdue-invoice) has the emails and a call script. Due on receipt suits most homeowner jobs. Net 15 or Net 30 suits businesses and property managers, as long as the terms were on the estimate.

## Estimates and invoices from the same line items

Retyping an estimate into an invoice is where line items go missing.

Clef Pro, our product, is field service software for trade businesses, with Ruth, an AI office manager, built in. In Clef Pro, an estimate is built from the same line items as the job and the invoice, sent to the customer, approved from a link and turned into a job. When the work is done, the tech taps Finish in the tech app or texts Ruth "done," and Ruth writes up the line items and the invoice from the job, at your prices and markup. The invoice is made in QuickBooks Online and goes to the customer once you say yes. Clef Pro doesn't take deposits, card payments or customer financing today, and it needs QuickBooks Online connected for invoicing. If you're setting that up, see our guide to [QuickBooks for contractors](https://clefpro.com/blog/quickbooks-for-contractors).

## More free templates

- [HVAC invoice template](https://clefpro.com/blog/hvac-invoice-template), with equipment and refrigerant fields
- [Plumbing invoice template](https://clefpro.com/blog/plumbing-invoice-template), with permit, part number and after-hours fields

## Frequently asked questions

### What is the difference between an estimate and a quote?

In everyday use, an estimate is your best judgment of the price, which can move if the job turns out differently, and a quote is a fixed price for a defined scope. What actually binds you is the wording on the document and your state's law, so say plainly whether the price is fixed and what would change it.

### How long should a contractor estimate be valid?

Long enough for the customer to decide, and short enough that your material prices and schedule still hold. Pick a window you can honor, such as 14 or 30 days, print the expiry date on the estimate, and re-price anything accepted after it.

### How much deposit can a contractor ask for?

It depends on your state. California, for example, caps the down payment on a home improvement contract at $1,000 or 10 percent of the contract price, whichever is less. Check your own state's contractor licensing board before you set a deposit.

### Is a signed estimate a contract?

It can serve as one. An estimate with a scope, a price, payment terms and both signatures is often used as the agreement for a smaller job. Whether it's enforceable, and what your state requires a home improvement contract to include, is a question for a lawyer where you work.

### Should a contractor charge for estimates?

That's a business choice. Some contractors give free estimates to win work, others charge a fee for design-heavy or long site visits and credit it toward the job if the customer goes ahead. Whichever you choose, say so before you go out.