# Work Order Template for Trade Jobs: Free Copy-and-Paste Form

> A free work order template for trade and home service jobs, with scope, site access, parts, time on site, photos and a customer sign-off. No sign-up needed.

Source: https://clefpro.com/blog/work-order-template
Published 2026-11-16.
Publisher: Clef Pro (Clef Pro Inc.)

A work order is what the tech has in hand when they knock on the door. If it says "fix leak" and nothing else, the tech calls the office from the driveway, the customer gets asked the same questions twice, and the invoice later has nothing to stand on. This free work order template gives the tech what they need to do the job without a call, and gives you a signed record of what was done.

It's built for trade and home service shops: plumbing, HVAC, electrical, handyman, cleaning and property maintenance. Copy it into Word, Google Docs or an email without signing up. Below are a checklist, every field explained with a filled sample, and a plain-text version to paste.

**Key takeaways**

- A work order tells the tech what to do and where. The invoice tells the customer what to pay. Keep them as two documents.
- Put site access on every work order: who will be there, how to get in, pets and parking.
- Write the scope and what's out of scope, plus any not-to-exceed amount the customer set.
- Close every work order with a customer sign-off, the time on site, photos and any work the customer declined.
- The tech's copy doesn't need to show prices or your costs.

## What goes on a work order?

A work order should give the tech everything needed to do the job without calling the office, and give you a signed record of what happened. That means the customer and site, how to get in, the problem and the scope, the parts needed, the time on site, notes and photos, and a customer sign-off. Here is the checklist.

- Work order number and the date it was issued
- Who requested the work, and their PO or reference number
- Customer name, phone and service address
- Site access: who will be there, gate or lockbox, pets, parking
- Scheduled date and arrival window
- Assigned tech or crew
- Priority: emergency, urgent or routine
- The problem, in the customer's words
- Scope of work, and what's out of scope
- Approval limit, if the customer set one
- Equipment on site, with make, model and serial
- Parts and materials to bring
- Safety notes, such as shutoff locations or a home built before 1978
- Work performed, parts used, and time in and out, filled in by the tech
- Before and after photos
- Follow-up needed and recommendations the customer declined
- Customer sign-off with name, signature and date

## Work order template: every field, with a sample

The sample is a made-up garbage disposal call at a rental unit, for a made-up company and property manager. The "filled in by" column shows who owns each field: the office before the visit, the tech during it, the customer at the end.

| Field | Filled in by | What goes in it | Sample |
|---|---|---|---|
| Work order number | Office | Unique, numbered in order | WO-5012 |
| Date issued | Office | The day the job was booked | November 16, 2026 |
| Requested by | Office | Who asked for the work, and their reference | Sample Property Management, PO #7781 (sample) |
| Customer and site | Office | Name, phone, full address with unit | Tenant: Jamie Example, (555) 010-0177. 90 Sample St, Unit 4, Anytown, ST 00000 |
| Site access | Office | Who's there, how to get in, pets, parking | Tenant home after 1 pm. Building door code is with the office. Small dog, keep the unit door closed. Street parking only |
| Schedule | Office | Date and arrival window | November 18, 2026, arrive between 1 pm and 3 pm |
| Assigned to | Office | Tech or crew | Alex (sample tech) |
| Priority | Office | Emergency, urgent or routine | Routine |
| Problem reported | Office | In the customer's words | "Disposal hums but won't turn, and the sink backs up" |
| Scope | Office | What to do | Diagnose the disposal. Repair if possible, or replace with a 1/2 hp unit. Clear the sink drain |
| Out of scope | Office | What not to do | Dishwasher, main drain line, cabinet repairs |
| Approval limit | Office | The most you can spend without asking again | Not to exceed $400 without the property manager's OK |
| Parts to bring | Office | What the job will likely need | 1/2 hp disposal and mounting kit |
| Safety notes | Office | Shutoffs, breakers, hazards | Disposal breaker is #14, panel in the hall closet |
| Work performed | Tech | What was done, in plain words | Disposal motor seized. Replaced with a new 1/2 hp unit, reconnected the drain and dishwasher line, tested, no leaks |
| Parts used | Tech | Quantity, part, model | 1 disposal, Sample Brand model SD-50 (sample). 1 mounting kit |
| Time on site | Tech | Arrival and departure | Arrived 1:20 pm, left 2:35 pm |
| Photos | Tech | Before, after, labels | Before, after, and the new unit's model label |
| Follow-up | Tech | Anything found outside the scope | Kitchen faucet drips. Reported to the property manager |
| Sign-off | Customer | Name, signature, date and time | Jamie Example (tenant), November 18, 2026, 2:33 pm |

## Copy-and-paste work order template

Copy the block below into Word, Google Docs or an email, replace each bracketed field, and delete the lines a job doesn't need. Print it, or send it to the tech's phone.

```text
WORK ORDER

[Business name] | [Phone]

Work order #: [number]
Date issued: [date]
Requested by: [name/company]
PO/reference #: [if any]

CUSTOMER AND SITE
[Name] | [Phone]
[Service address, unit]

SITE ACCESS
Who will be there: [name, time]
Entry: [gate, lockbox, key]
Pets: [details]
Parking: [where]

SCHEDULE
Date: [date]
Arrival window: [time to time]
Assigned to: [tech or crew]
Priority: [emergency/urgent/routine]

JOB
Problem reported: [their words]
Scope: [what to do]
Out of scope: [what not to do]
Approval limit: [amount]
Equipment: [make, model, serial]
Parts to bring: [list]
Safety notes: [shutoffs, hazards,
  built before 1978?]

COMPLETED BY TECH
Work performed: [plain words]
Parts used: [qty, part, model]
Time in: [time]  Time out: [time]
Photos taken: [yes/no]
Follow-up needed: [details]
Recommended, declined: [details]

CUSTOMER SIGN-OFF
The work above was completed and
the site was left clean.
Name: [print]
Signature: ____________________
Date: [date]  Time: [time]
```

## Work order, estimate or invoice: which one do you need?

Owners use these words loosely, and some shops run all three on one sheet of paper. They do different jobs:

| | Estimate | Work order | Invoice |
|---|---|---|---|
| What it's for | Pricing the job before it's agreed | Telling the tech what to do and where | Asking to be paid for what was done |
| When | Before the job | Before and during the job | After the job, or after a stage |
| Who reads it | The customer | The tech or crew, then the office | The customer, or their accounts payable |
| Prices on it | Yes | Only if it doubles as the approval | Yes |
| Who signs | The customer, to approve | The customer, to confirm the work | Usually nobody |

On a bigger job the order runs estimate, then work order, then invoice. Our [contractor estimate template](https://clefpro.com/blog/contractor-estimate-template) covers the first step. On a service call, the work order often stands in for the estimate: the customer approves the scope and price on it before the tech starts.

## Site access: the field that saves the most phone calls

Every call from a tech standing at a locked gate is time nobody gets paid for. Fill in site access before the visit:

- **Who will be there,** and from what time. For a rental, note whether the tenant or the property manager arranged the visit, and the time they confirmed.
- **How to get in:** gate, lockbox, key pickup, building door, elevator or loading dock hours for commercial sites. Keep codes in the job record your office controls. Paper gets left on dashboards.
- **Pets,** and whether they need to be shut away.
- **Parking,** and anything about the truck: a low garage, a narrow drive, a permit-only street.

## Scope, out of scope and approval limits

Write the scope as things to do: "diagnose," "replace," "clear," "test." Then write what's out of scope. It gives the tech a clean answer when the customer asks "while you're here, can you look at...?"

If the customer or a property manager gives you a not-to-exceed amount, put it on the work order. When a job runs past it, the tech stops, calls for approval, and notes on the work order who approved the change, when, and the new amount.

If a tech sells extra work at a customer's home beyond what they called about, federal cancellation rules may apply. The FTC's Cooling-Off Rule gives buyers three business days to cancel many sales of $25 or more made at their home, with exemptions for repair or maintenance visits the customer asked for and for emergencies ([FTC](https://consumer.ftc.gov/articles/buyers-remorse-ftcs-cooling-rule-may-help)). Ask your lawyer how it applies to your field sales.

## Safety notes, including older homes

Put what the tech needs to know before they open anything: where the water shutoff and the breaker are, any known hazard, and anything the customer warned you about.

Note the year the home was built, too. The EPA says firms whose renovation, repair or painting work disturbs lead-based paint in homes and child care facilities built before 1978 must be EPA-certified ([EPA](https://www.epa.gov/lead/lead-renovation-repair-and-painting-program-rules)). A "built before 1978?" line on the work order makes sure someone asks before the tech cuts into a wall.

## Sign-off: what the customer is signing

The sign-off closes the work order. Keep the wording short and specific: the work listed was completed, and the site was left clean. Next to it, record:

- The time in and out, so any time-based charge can be checked.
- Before and after photos, which back you up when nobody is home to sign.
- Any recommendation the customer declined, in writing, so it's on record that you told them.

For rentals, the tenant's signature confirms the work happened. The property manager or owner is still the one who approves the bill.

## Keep prices off the tech's copy

The tech needs the scope, the site and the parts. They don't need your price book or your margins. If the work order doubles as the customer's approval, keep two versions: the customer's copy with prices, and the field copy without. It also stops a tech from quoting a price on the spot that the office never set.

## Payment terms on a work order

If the customer signs the work order to approve the job, it should carry the price, any deposit and the payment terms, because that's the moment they're agreeing to them. Payment terms and late fees have to be agreed before the work, and the rules on late fees, interest and deposits vary by state.

*This is general information, not legal, tax or financial advice.*

## From work order to invoice, and getting paid

The work order is the raw material for the invoice. Build the invoice from the parts used, the time on site and the work performed, and send it the same day.

- **Homeowners:** due on receipt, with payment taken at the job if you can.
- **Property managers and businesses:** Net 15 or Net 30 if that's what you agreed, sent to accounts payable with their PO number and your work order number on it.
- **Late payers:** a reminder the first business day after it's due, a firmer email at a week, then a call. Our guide on [how to follow up on an overdue invoice](https://clefpro.com/blog/how-to-follow-up-on-an-overdue-invoice) has the scripts.

The [contractor invoice template](https://clefpro.com/blog/contractor-invoice-template), the [plumbing invoice template](https://clefpro.com/blog/plumbing-invoice-template) and the [HVAC invoice template](https://clefpro.com/blog/hvac-invoice-template) pick up where this one leaves off.

## A work order the tech doesn't have to fill in

Paper work orders work until the handwriting does. The fields that go missing are the ones the invoice needs most: the parts used and the time on site.

Clef Pro, our product, is field service software for trade businesses, with Ruth, an AI office manager, built in. Each tech gets their day in the tech app, opened from a link on their phone, with addresses, notes and map links, and Ruth texts each tech their day by 7am. One tap each for On my way, Start and Finish records the time, and photos and notes attach to the job. Techs never see your prices or costs, and the app shows the last day loaded when there's no signal. A tech who never opens it can just text Ruth. When the job's done, the tech taps Finish or texts "done," and Ruth writes up the line items and the invoice from the job, at your prices and markup. The invoice is made in QuickBooks Online and goes to the customer once you say yes.

For recurring visits, see the [HVAC maintenance agreement template](https://clefpro.com/blog/hvac-maintenance-agreement-template).

## Frequently asked questions

### What is the difference between a work order and an invoice?

A work order tells your tech what to do, where and when, and records what they did. An invoice asks the customer to pay for it. The work order comes first, and the invoice is built from it: the parts used, the time on site and the work performed.

### What is the difference between a work order and a purchase order?

A purchase order comes from the customer. It's their approval to buy something, with their own PO number. A work order is yours, and tells your tech what to do. Put the customer's PO number on your work order and your invoice so their office can match the three.

### Who signs a work order?

The customer, or whoever is on site for them, signs at the end to confirm the work was done and the site was left clean. If the customer approves the scope and price on the work order before you start, get a signature then too.

### Should a work order show prices?

It depends on who it's for. If the work order doubles as the customer's approval, it needs the price. The copy your tech carries doesn't have to show prices or your costs, and it's often better if it doesn't.
