All guides

Getting Paid

Plumbing Invoice Template: Free Copy-and-Paste Version

12 min read

Plumbing invoices get questioned in the same few places. The after-hours charge. The part number the customer has never seen. The permit fee. Whether the warranty covers your labor or only the water heater. This free plumbing invoice template answers each of those on the page, so the customer can pay it instead of calling you about it.

Copy it into Word, Google Docs or an email without signing up. Below you'll find a checklist, every field explained with a filled sample for a made-up water heater replacement, and a plain-text version to paste.

What goes on a plumbing invoice?

A plumbing invoice should show what was wrong, what you did about it, and what each piece cost, in a way the homeowner can check. On top of the usual business and customer details, that means part numbers, permit details, any after-hours charge and the warranty on parts and labor. Here is the checklist.

  • Business name, address, phone, email and plumbing license number
  • Invoice number, invoice date and due date
  • Customer name, billing address and service address
  • The problem reported and what you found
  • The work done, in plain words
  • Labor, as hours times rate or a flat-rate price per task
  • Service call or diagnostic fee, and whether it's credited toward the repair
  • Each part and fixture with brand, model or part number, and quantity
  • Permit fee and permit number, if the job needed one
  • After-hours or emergency charge, labeled, with the time of the call
  • Disposal or haul-away
  • Tax, any deposit received, and the balance due
  • Warranty: the manufacturer's parts warranty and your labor warranty, listed separately
  • Payment terms and the ways you accept payment
  • Recommended work the customer declined, if any
  • The tech who did the work

Plumbing invoice template: every field, with a sample

The sample column is a made-up water heater replacement for a made-up company. The prices are made-up sample numbers to show the layout. Don't read them as a price guide.

FieldWhat goes in itSample
Business detailsName, address, phone, emailSample Plumbing Co., 200 Example St, Anytown, ST 00000, (555) 010-0123
License numberYour plumbing license, as your state or city issues itPlumbing license #000000 (sample)
Invoice numberUnique, numbered in order2041
Invoice dateThe day you send itNovember 16, 2026
Due dateA calendar date from your termsDue on receipt, November 16, 2026
CustomerName and billing addressPat Example, 34 Sample Ct, Anytown, ST 00000
Service addressWhere the work was done, if differentSame as billing
Tech and timesWho did the work, arrival and finishAlex (sample tech), 8:10 am to 12:25 pm
Problem reportedIn the customer's words"No hot water, and water on the garage floor"
What you foundYour diagnosis40-gallon gas water heater leaking from the tank, 14 years old per the data plate
Work performedPlain wordsDrained and removed the old heater, installed a new 50-gallon gas heater with new connectors and an expansion tank, tested for leaks, checked venting
Service callDiagnostic or trip fee, and whether it's creditedService call, $89.00
Parts and fixturesBrand, model or part number, quantity, priceSample Brand 50-gallon gas water heater, model SB-50G (sample), 1 × $1,150.00
Install materialsConnectors, fittings, tanksFlex connectors, expansion tank and fittings, $185.00
LaborHours times rate, or the flat-rate task price4.0 hrs × $120.00 = $480.00
PermitIssuer, permit number and feeAnytown Building Dept. permit #P-0000 (sample), $75.00
After-hours chargeLabeled, with the time of the callNone on this job
DisposalHaul-away of old equipmentOld heater haul-away, $50.00
SubtotalAll charges before tax$2,029.00
Sales taxOnly what your state requires6% on parts and materials (sample rate), $80.10
TotalSubtotal plus tax$2,109.10
WarrantyParts and labor as separate termsHeater: manufacturer's warranty, registered by us, serial on file. Labor: one year on our installation
NotesDeclined work, follow-upsRecommended replacing the corroded main shutoff valve. Customer declined for now
How to payEvery way you accept paymentCard or bank transfer through the payment link, or check

Copy-and-paste plumbing invoice template

Copy the block below into Word, Google Docs or an email, replace each bracketed field, and delete the lines a job doesn't need.

INVOICE

[Business name]
[Street, city, state, ZIP]
[Phone] | [Email]
Plumbing license #: [number]

Invoice #: [number]
Invoice date: [date]
Due date: [date] ([terms])

CUSTOMER
[Name]
[Billing address]
Service address: [if different]

JOB
Tech: [name]
Arrived [time], finished [time]
Problem reported: [their words]
What we found: [diagnosis]
Work performed: [plain words]

CHARGES
Service call: [amount]
  Credited to repair? [yes/no]
Labor: [hrs] x [rate] = [amount]
  or flat rate: [task] [price]
Part: [brand, model or part #]
  [qty] x [price] = [amount]
Materials: [list] = [amount]
Permit #[number], [issuer]:
  [amount]
After-hours, call at [time]:
  [amount]
Disposal/haul-away: [amount]

Subtotal: [amount]
Sales tax ([rate]): [amount]
Total: [amount]
Paid today/deposit: [amount]
BALANCE DUE: [amount]

WARRANTY
Parts: [maker's warranty, term,
  registered? yes/no]
Labor: [your warranty, term]

NOTES
Recommended, declined: [work]

HOW TO PAY
[Card/payment link, transfer,
check payable to ...]
Due by [date].
[Late fee, if agreed before work]

Thank you. Questions? [phone]

What do generic invoice templates miss for plumbing?

A blank invoice from an accounting app has a box for "description" and a box for "amount." Plumbing jobs need more than that.

Permit numbers

When a job needs a permit, put the permit number on the invoice as well as the fee. It ties your bill to the inspection record, it shows the customer exactly what the city or county charged, and it's the record the homeowner will want if a buyer or inspector asks about the work later. Which jobs need a permit is set locally, so check with your building department. If you charge for your time pulling the permit, put that on its own line too.

Part and fixture numbers

Write the brand and the model or part number for every part bigger than a fitting. It helps in three ways. The customer can see you charged for a real, specific part. A warranty claim later takes minutes instead of a dig through receipts. And the next tech who comes out knows what's installed before they open the cabinet. For water heaters, softeners and other equipment, note the serial number too, so the warranty can be registered and the age is on record.

Parts warranty versus labor warranty

A homeowner who hears "it's under warranty" usually assumes everything is covered. Split it on the invoice:

  • Parts: whose warranty it is, usually the manufacturer's, how long it runs, and whether you registered it.
  • Labor: your own guarantee on your workmanship, how long it runs, and what it covers.

Federal law treats the two differently. The FTC's guide to the Magnuson-Moss Warranty Act says the Act covers written warranties on consumer products, including property "attached to or installed on real property," and that it "does not apply to warranties on services." If one warranty of yours covers both the parts you supplied for a repair and your workmanship, the Act does apply, and a written warranty on a consumer product costing more than $10 has to be titled "full" or "limited" (FTC). If you write your own parts-and-labor warranty, read that guide or have a lawyer look at your wording.

After-hours and emergency rates

An emergency call late at night is where a lot of invoice disputes start. Three habits keep it clean:

  1. Quote the after-hours rate or surcharge on the phone before you go, and note who agreed and when.
  2. Put it on the invoice as its own labeled line with the time the call came in, such as "After-hours service, call received 10:40 pm."
  3. Use the same definition of after-hours every time: the hours, weekends and which holidays.

If you're still settling what to charge, our guide to plumber hourly rates walks through the math.

Service call fees and flat rates

Say on the invoice whether the service call or diagnostic fee is credited toward the repair. If you price by flat rate, show the task and its price, the one the customer approved before you started. If you bill time and materials, put the arrival and finish times on the invoice so the hours can be checked.

Recommendations the customer declined

If you recommended work the customer turned down, such as a corroded shutoff or a failing pressure-reducing valve, write it on the invoice. It's a record that you told them, and a reason to call them back.

Extra sales at the customer's home

If a tech sells something beyond the repair the customer called about, such as a water softener, federal cancellation rules may apply. The FTC's Cooling-Off Rule gives buyers until midnight of the third business day to cancel many sales of $25 or more made at their home, and the seller has to give them a copy of the contract or receipt and two copies of a cancellation form. The rule exempts sales made because the customer asked you to come out to repair or maintain their property, and sales needed to meet an emergency, but items bought beyond that request are covered (FTC). Ask your lawyer how it applies to the way your techs sell.

Payment terms and late fees for plumbing jobs

For homeowners, due on receipt with payment taken at the job is the simplest. For property managers and commercial customers, you might offer Net 15 or Net 30, with the invoice sent to accounts payable and their PO number on it. Either way, write the due date as a date.

On larger jobs such as repipes, take a deposit or bill in stages. Some states limit how much you can take up front on home improvement work. California, for example, caps the down payment at $1,000 or 10 percent of the contract price, whichever is less (CSLB).

Payment terms, deposits and late fees have to be agreed with the customer before the work, in your estimate, work order or written terms. The rules on late fees and interest vary by state, so have your terms checked for where you work.

This is general information, not legal, tax or financial advice.

How to send a plumbing invoice and get paid faster

  • Finish the invoice before you leave. Go over it with the customer at the job, and take payment there if you can.
  • Send it by text and email with a payment link, so the customer can pay from their phone.
  • Attach photos. Before-and-after shots and a photo of the failed part settle most questions.
  • Send commercial invoices to the right place, usually accounts payable, with the PO or work order number.
  • Follow up on a schedule: a reminder the first business day after it's due, a firmer email at a week, and a call at two weeks. Our guide on how to follow up on an overdue invoice has the scripts.

Let the job write the invoice

A template helps, but someone still has to fill it in, usually at night, from a tech's notes and a handful of supply house receipts.

Clef Pro, our product, is field service software for trade businesses, with Ruth, an AI office manager, built in. When a plumber finishes, they tap Finish in the tech app or just text Ruth "done." Ruth writes up the line items and the invoice description from the job, at your prices and markup, and the invoice is made in QuickBooks Online. It goes to the customer once you say yes. Techs never see your prices or costs in the app. Clef Pro needs QuickBooks Online connected for invoicing, payments are recorded there, and Clef Pro doesn't take card payments or deposits itself. Our page on the plumbing invoice app covers what that looks like day to day.

More free templates

Frequently asked questions

What should a plumbing invoice include?

Your business details and plumbing license number, an invoice number and due date, the customer and service address, the problem and what you did, labor, each part with its brand and model or part number, any service call fee, permit fee and permit number, any after-hours charge, tax, the balance due, the warranty on parts and on labor, and how to pay.

Should plumbers list parts and labor separately?

Yes. Separate lines let the customer see what the parts cost and what your time cost, which heads off most questions. It also lets you show two different warranties: the manufacturer's on the part and yours on the workmanship.

Does the permit fee go on a plumbing invoice?

Yes, on its own line with the permit number. It shows the customer what the city or county charged, and it ties your invoice to the inspection record if anyone asks about the work later.

How do I bill an emergency or after-hours plumbing call?

Tell the customer the after-hours rate or surcharge on the phone before you go, and note who agreed and when. On the invoice, put the charge on its own labeled line with the time the call came in, and use the same definition of after-hours every time.

When should a plumber send the invoice?

Before you leave the job, or the same day. For homeowners, due on receipt with payment taken at the job is the simplest. Commercial customers and property managers usually need the invoice sent to accounts payable with their PO number.

Clef Pro

You run the jobs. Ruth runs the office.

Clef Pro is field service software with Ruth, an AI office manager, built in. She books the work, texts your techs their day, writes up the invoices and chases what you’re owed. Two weeks free.